Industrial 

In floor heating tubes laid on top of the rebar.
Insulation was placed under the rebar and the heating tubes.
This shows the concrete being placed.

This shows the rebar where there is no in floor heating
This shows the rebar in both non heated and heated areas
Before final float and brushed finished
Here the cement pump delivers the concrete to the right spot.
18,000 sq. ft pour size

Bull floating the surface before final float and broom finish.

 

This Job was completed by SCF Concrete