Industrial
|
| In floor heating tubes laid on top of the rebar. |
|
| Insulation was placed under the rebar and the heating tubes. |
|
| This shows the concrete being placed. |
|
|
| This shows the rebar where there is no in floor heating |
|
| This shows the rebar in both non heated and heated areas |
|
| Before final float and brushed finished |
|
| Here the cement pump delivers the concrete to the right spot. |
| 18,000 sq. ft pour size |
|
|
Bull floating the surface before final float and broom finish. |
|
|